Houay Ho Dam Hydropower Info - by Hobo Maps - - Go to Hydropower Projects Page --- Home

Houay Ho hydropower project is located in Samakkhixay District, Attapeu Province, Lao PDR about 150 km east of Pakse and 35 km northwest of Attapeu town - as seen in satellite image below:

The project is a 'build-operate-transfer' hydropower project with installed capacity of 152 megawatts.

The Project was initiated by Daewoo Engineering and Construction from South Korea and Loxley PLC in an agreement with the Lao government in 1993 for a concession period of 30 years commencing from 1999 when commercial operations began.

Houy Ho was the first hydropower project in Lao PDR to be developed by an Independent Power Producer (IPP).

In January 2002, Tractebel Electricity and Gas International and MCL purchased 80% of Daewoo’s and Loxely PLC’s shares. Tractabel then became a subsidiary of GDF Suez. Other ownership changes occured.

According to the project website in 2023 the project owner is Huay Ho Power Co., with shareholders - Glow Company Limited owning 67.5 percent, WHA Energy 2 Co., Ltd. holding 12.5 percent and EDL GEN holding 20 percent.

Some debt financing was raised from international private banks.

Houay Ho Hydropower Project satellite image below:

Houay Ho Dam Site is located at coordinates 15°03'32.0"N 106°45'52.2"E (15.058900, 106.764500) below:

Intake structure satellite image below at coordinates - 15°03'54.0"N 106°48'24.6"E (15.065000, 106.806833):

Houay Ho Powerhouse in images below located at coordinates 15°04'39.7"N 106°49'46.2"E (15.077700, 106.829500):

Houoy Ho HPP is situated on the Bolaven Plateau in the south of Lao PDR. The Plateau is an elevated area of about 5,000 square km that covers parts of Champasak, Saravan and Attapeu Provinces. The southern and eastern parts of the plateau rim form a very steep escarpment which changes elevation from about 500 to 1,200 meters above sea level over a short distance and is an excellent site for high-head hydropower projects.

Houay Ho Hydropower Project layout charts below:

The project transfers water from the Houay Ho River basin to the Xe Kong River to take advantage of the altitude difference (head) dropping off the edge of the Bolaven Plateau. The project creates a reservoir with a surface area of 37 square km. The catchment area is 192 square kilometers.

The powerhouse has two Francis type turbines of 75 MW each and a single Pelton turbine of 2.1 MW for total capacity of 152.1 MW.

Houay Ho Powerhouse images below:

Houay Ho Dam images below:

Normal active reservoir surface level is estimated to be 867 meters above sea level. 3,530 million cubic meters total storage volume of reservoir with effective volume of 527 million cubic meters.

Houay Ho Powerhouse control room below:

Houay Ho Powerhouse apparatus room below:

The project involved resettlement and relocation of 12 Nya Heun villages into an area adjacent to Lavaen villages with some funds used for establishing coffee plantations on the Bolaven Plateau.

Houay Ho Hydropower project location in image below:

Houay Ho hydropower project is located in center of Southern Laos map below:

98% of the energy generated from the project is planned to be supplied to Electricity Generating Authority of Thailand (EGAT) in Thailand in accordance with a Take-or-Pay commitment for a period of 30 years. The remaining 2% goes to the EDL grid for distribution to adjacent local areas in Laos.

In June 1997 a Power Purchase Agreement (PPA) with EGAT was signed. Under the Agreement, Huay Ho Power Co. is to supply 126 MW per day or 394.2 GWh output per year to Thailand.

Map below shows route of transmission line for export of power to Ubon 2 substation near Ubon Ratchathani Thailand.