Nam Ngiep 2A Dam Hydropower info by Hobo Maps - Go to Hydropower Projects Page - - Home

Nam Ngiep 2A Hydropower project is part of Nam Ngiep 2ABC Hydropower project (2A, 2B & 2C). Lao-based Nonghai Group Co. Ltd. is developing several hydropower sites in northern Laos southeast of the Plain of Jars area and another in Kham District. Nonghai Group Facebook page HERE .

Nam Ngiep 2A project is located near Sai Nam Ngiep, Xieng Khong Village, Tha Thom District, Xaysomboun Province, Lao PDR.

Nam Ngiep 2A dam construction site is located at coordinates - 19°09'12.7"N 103°20'41.4"E (19.153525, 103.344836) as shown in the satellite image below:

The engineering, procurement and construction (EPC) contractor for the project was Chongqing Water Turbine Works Co., Ltd (CWTW) from China.

The project installed capacity is 10.5 MW from 3 Vertical Francis turbine-generator sets of 3.5 MW each with annual output potential of 52 GWh.

The dam is constructed of reinforced concrete with a drainage gate.

The project water catchment area is 878 square kilometers.

At the end of 2021 it seems construction of the project had been halted due to Covid-related issues and not restarted as of 2023.

Nam Ngiep 2 dam site is slightly downriver and close to Nam Ngiep 2B hydropower project site - both are seen in satellite image below:

Nam Ngiep 2A dam construction site images below from Nonghai Group website dated August 2019.

Nam Ngiep 2A dam structure images below as posted onto a Facebook page by a Lao worker December 2021 with comment it was "silent" due to Covid-related problems (as translated):

Nam Ngiep 2A powerhouse building image below as posted onto a Facebook page by a Lao worker December 2021 with comment it was "still waiting" due to Covid-related problems (as translated).

Map below shows location for Nam Ngiep 2A dam site but not for the powerhouse.

Click to see our other web pages for Nam Ngiep 2B and Nam Ngiep 2C.

Satellite image map below for Nam Ngiep 2A, 2B & 2C hydropower projects: